Factory Workshop, Fabrication and Inspection

Yuli Machinery prepares cement silo panels, cone sections, support parts and related batching plant equipment for project-specific production and export delivery.

Yuli Machinery fabrication workshop

Workshop and Component Preparation

These images show the workshop areas and staged components involved in forming, assembly preparation and shipment.

Workshop floor for silo component fabrication
Workshop and component staging
Curved cement silo sections with bolted flanges
Curved section and flange preparation
Curved steel panels prepared for silo fabrication
Formed panels prepared for the next process

Production sequence reviewed against the drawing

Before cutting starts, the team confirms the part list, dimensions, connection points and surface treatment requirement. The final process depends on whether the order is a complete silo package, screw conveyor, accessory set or drawing-based component.

  1. Drawing and scope reviewConfirm capacity, dimensions, material and interfaces.
  2. Cutting and formingPrepare wall, cone, roof and support components.
  3. Welding and connection workComplete welded parts and bolted flange details.
  4. Surface preparationApply the confirmed coating or other treatment.
  5. Final inspection and packingCheck parts, finish, quantities and loading sequence.
Silo sections prepared in the factory
Production reference: formed sections and workshop staging

Checks before dispatch

Inspection requirements can be added to the order documents. The exact checklist is confirmed with the buyer.

Dimensions

Key sizes and connection positions against the approved drawing.

Fabrication

Weld appearance, panel edges, hole pattern and structural completeness.

Surface finish

Coating condition and protected connection surfaces before loading.

Parts count

Fasteners, accessories, labels and packing list completeness.

Loading sequence

Packages arranged so the site team can identify parts after arrival.

Delivery records

Packing and loading photos when included in the confirmed scope.

Cement silo components on a transport vehicle

Parts Prepared for Packing and Site Identification

For a bolted silo, packing logic affects installation. Components, accessories and fasteners should be grouped with a packing list and a loading sequence that the destination team can follow.

Send the drawing or project requirement

We can review a complete silo package, matched equipment or a smaller drawing-based component requirement.

WhatsApp